Project Histories

  • Parking Garage, North York, ON
  • Lombard Parking Garage Deck, Winnipeg, MB
  • Bridge Deck, Omaha, NE
  • Bridge Deck, St. Louis, MO
  • Bridge Deck, Winnipeg, MB
  • Bridge Pier, Omaha, NE
  • Bridge Pier, Minot, ND
  • Bridge Deck & Parapet Wall, Quebec City, QC
  • Bridge Parapet Walls, Renfrew, ON
  • Bridge Curbs, Winnipeg, MB
  • Pre-stressed Beam Ends, Winnipeg, MB
  • Pre-stressed Beam Ends, Council Bluffs, IA
  • Pre-stressed Beams, Southern Ontario
  • Gulf Shores Condos, Indian Shores, FL
  • Condominum, Medeira Beach, FL
  • Hospital Sterilization Room Floor, Fairfax, VA


    more...

    Vector Galvashield® XP

    Bridge Deck Rehabilitation Omaha, Nebraska

    Structure: Woolworth Avenue Bridge Deck over I - 480
    Specifier: Nebraska Department Of Roads (NEDOR)
    Location: Omaha, Nebraska, USA
    Date: July, 1999

    Project Description:
    Prolonged exposure to de-icing salts was the cause of severe deterioration of the bridge deck. Since the deck is a typical girder box bridge, rehabilitation options were limited.

    Project Solution:
    The Nebraska Department of Roads wished to evaluate the effectiveness of the Galvashield® XP after incorporating them into the deck chip and patch work. The overlay was removed, anodes were installed along a repair boundary and a new overlay was installed. As an additional benefit, and at the request of the NEDOR, the anodes can be monitored on a continual basis.

    ©2005 Vector Corrosion Technologies. All rights reserved.
    No part of this web site may be reproduced without the express written consent of Vector Corrosion Technologies.

    To report technical problems when attempting to use this website please contact the webmaster.